Panel procedure
Capital Works Management Framework, Guidance Note, Glossary, Published by the Government of Ireland Department of Finance in 2009 suggests that: ‘The panel procedure is one that may be used by the Contracting Authority for the procurement of a specialist works contractor. A panel of specialists is proposed by the Contracting Authority, and the main contract tenderers can then choose to use a panel specialist or propose an alternative specialist with their tender submission. Any applicant for the panel of specialist works contractors may express an interest in being included on a panel in the main contract tender invitation; but only those that qualify are placed on the panel.’
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.